200 MW Photovoltaic Project | El-M’Ghaïer | Algeria.
Matelec is proud to collaborate with CSCEC Algérie (China State Construction Engineering Corp. Ltd.) on the 220 kV High Voltage Substation and Extension works — including two 160 MVA – 30/220 kV Power Transformers, which have now successfully arrived on site — as part of the M’Ghaïer Tendla 200 MW Photovoltaic Project in the El-M’Ghaïer region of Algeria.